How Link Visibility Parameter to Move Action ?

Hi,

I have 2 pillars. these are moving by using the parameter from 1500 to 2000mm (these two distances only) - i will made a DesignTable later.

then I have a chain, actually two, one 1500mm and the other 2000mm - these will be between the pillars. chains are added as a component and I have already set the visibility parameter in main drawing .(on/off)

How Link Visibility Parameter to Move Action ?

So in the end I want the columns to move and when the distance is 1500mm I want to see a short chain and when it is 2000mm I want to see a long chain.

thanks for the ideas

Comments

  • Hello.

    Depending on the design intent, a simpler approach seems to be to make a copy of one of the pillars at the requested position.
    So, the block will contain Pillar_1, Pillar_2_1500, Pillar_2_2000, Chain_1500, and Chain_2000.

    The first visibility state will display Pillar_1, Pillar_2_1500, and Chain_1500.
    The second visibility state will display Pillar_1, Pillar_2_2000, and Chain_2000.

    Another approach could be to create some suppress parameters and make them 0 or one depending on the value of the main distance parameter, which is either 1500 or 2000.

  • Thanks for the reply.

    In the meantime, I've finally solved it by adding the chains separately as 2 new components. I then added Visibility Status to these.

    Status on off by length 1500 or 2000mm. In the parameter manager, Iam then unlinked this status and deleted.I only had Suppress 1 and Suppress 2 left. Then I created a design table with these two and with the width parameter.

    The design table then looks like this: Width,look_1,look_2,Width

    1500,1,0,1500

    2000,0,1,2000

Welcome!

It looks like you're new here. Sign in or register to get started.

Welcome!

It looks like you're new here. Sign in or register to get started.